Original Library (left third of photo), Township
Offices (middle third), and Community Center (right third) |
|
 |
Basement starting to be dug out. Photo
taken from parking lot, in front of town offices, November 22. |
 |
Basement beginnings, photo taken
November 22, facing existing library
(and original/old library
entrance).
|
|
 |
More basement digging, photo taken
from 'old' entrance to library door, on December 2. |
 |
Footing being established.
View from old entrance library door, facing parking lot.
Photo taken December 6.
|
|
 |
Cement wall forms on left, preparing
for pouring cement. Photo taken December 12. |
 |
Finalization of footing. Photo
taken December 12. |
|
 |
Photo taken December 21.
Installation of forms for cement walls nearly complete. |
 |
Photo taken December 21. Forms
for cement walls nearly complete. View facing the original entrance. |
|
 |
Photo taken December 21. Forms
for cement walls nearly complete. View standing in original entrance. |
 |
Cement Pouring DAY for the basement walls. December
22, 2006. Photo taken near 'old' entrance. |
|
 |
December 22. View of the
'curved' part of the addition, ready for concrete.
|
 |
Cement forms are down, leaving us
with our 'real' cement walls for the basement. Photo taken Dec. 27. |
|
 |
Installed eye beam, photo taken
01/03/2007. |
 |
Basement floor being leveled. |
|
 |
Basement now 'enclosed' by plastic to protect
the work being done below. 01/05/2007. |
 |
Finishing the cement slab of the new entry way. |
|
 |
Basement FLOOR cement pouring day! |
 |
Basement floor cement pouring day! |
|
 |
View of basement stairwell and
elevator shaft. |
 |
Southerly view of building. |
|
 |
Westerly
architect drawing |
 |
Southerly
view of architect drawing |
|
 |
General floor
plan of the library after the building is completed. |
 |
Installing cement slabs for the main 'floor'.
Photo taken 01/22/2007. |
|
 |
Installing cement slabs for the main 'floor'.
Photo taken 01/22/2007. |
 |
Walls going up
01/31/2007 |
|
 |
Roof Trusses added, viewed from Playground.
02/05/2007 |
 |
Roofing going up.
02/10/2007 |
|
 |
The roof is up and the building is taking shape.
02/18/2007 |
 |
The outside of the reading area by the garden.
02/18/2007 |
|
 |
The inside of the reading area by the garden
02/18/2007 |
 |
View from the playground.
02/18/2007 |
|
 |
Interior work, electrical. |
 |
Tyvek house wrap now up on exterior. |
|
 |
Elevator shaft exterior completed (elevator
itself is not to be installed... this is allowance for future
plans.) |
 |
Main floor, heating elements being installed. |
|
 |
Insulation added. |
 |
More electric, floor heating, etc. |
|
 |
Cement floor pouring day! Starting at
existing library wall. |
 |
Cement floor pouring day! Center of building. |
|
 |
Cement floor pouring day!
Next to the bay windows. |
 |
Cement floor pouring day!
Finalizing. |
|
 |
Cement Floor Done! Photo taken 03/16/2007. |
 |
New 'main' entry being constructed. |
|
 |
Sky Lights, windows are 'in', and the drywall is up. |
 |
Drywall installed. |
|
 |
Playground 'side'. |
 |
Inside the original library, looking at the new entryway (under
construction). 04/06/2007 |
|
 |
Priming and Painting. 04/06/2007 |
 |
Priming and Painting 04/06/2007 |
|
 |
Outside of the small conference room. 04/06/2007 |
 |
Inside of the small conference room. 04/06/2007 |
|
 |
View from the basement, looking up the stairs to the new library.
04/06/2007 |
 |
View of the original entryway into the library, slowly being torn
apart for the new. 04/06/2007 |
|
 |
Siding up on playground side of building. Note the trees have
been removed. 04/06/2007 |
 |
Parking lot view of new building. Siding has been started.
04/06/2007 |
|
 |
New Windows next to flower garden. 04/08/2007 |
 |
New Windows next to flower garden. 04/08/2007 |
|
 |
New Windows next to flower garden. 04/08/2007 |
 |
Starting the process of moving ALL those books! 04/08/2007 |
|
 |
Starting the process of moving ALL those books! 04/08/2007 |
 |
Starting the process of moving ALL those books! 04/08/2007 |
|
 |
Taking a break... photo of several of our library board
members. 04/08/2007 |
 |
Installing lights. 04/08/2007 |
|
 |
06/22/2007 |
 |
06/22/2007 |
|
 |
06/22/2007 |
 |
06/22/2007 |
|
 |
06/22/2007 |
 |
06/22/2007 |
|
 |
06/22/2007 |
 |
06/22/2007 |
|
 |
06/22/2007 |
 |
06/22/2007 |
|
 |
06/22/2007 |
 |
06/22/2007 |
|
 |
Open House / Dedication 06/30/2007 |
 |
Open House / Dedication 06/30/2007 |
|
 |
Open House / Dedication 06/30/2007 |
 |
Open House / Dedication 06/30/2007 |
|
 |
Open House / Dedication 06/30/2007 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|