Original Library (left third of photo), Township Offices (middle third), and Community Center (right third)   Basement starting to be dug out.  Photo taken from parking lot, in front of town offices, November 22.

Basement beginnings, photo taken November 22, facing existing library

(and original/old library entrance).

  More basement digging, photo taken from 'old' entrance to library door, on December 2.

Footing being established.  View from old entrance library door, facing parking lot.

Photo taken December 6.

  Cement wall forms on left, preparing for pouring cement.  Photo taken December 12.
Finalization of footing.  Photo taken December 12.   Photo taken December 21.  Installation of forms for cement walls nearly complete.
Photo taken December 21.  Forms for cement walls nearly complete.  View facing the original entrance.   Photo taken December 21.  Forms for cement walls nearly complete.  View standing in original entrance.
Cement Pouring DAY for the basement walls.  December 22, 2006.  Photo taken near 'old' entrance.  

December 22.  View of the 'curved' part of the addition, ready for concrete.

Cement forms are down, leaving us with our 'real' cement walls for the basement.  Photo taken Dec. 27.   Installed eye beam, photo taken 01/03/2007.
Basement floor being leveled.   Basement now 'enclosed' by plastic to protect the work being done below.  01/05/2007.
Finishing the cement slab of the new entry way.   Basement FLOOR cement pouring day!
Basement floor cement pouring day!   View of basement stairwell and elevator shaft.
Southerly view of building.   Westerly architect drawing
Southerly view of architect drawing   General floor plan of the library after the building is completed.
Installing cement slabs for the main 'floor'.  Photo taken 01/22/2007.   Installing cement slabs for the main 'floor'.  Photo taken 01/22/2007.
Walls going up

01/31/2007

  Roof Trusses added, viewed from Playground.

02/05/2007

Roofing going up.

02/10/2007

  The roof is up and the building is taking shape.

02/18/2007

The outside of the reading area by the garden.

02/18/2007

  The inside of the reading area by the garden

02/18/2007

View from the playground.

02/18/2007

  Interior work, electrical.
Tyvek house wrap now up on exterior.   Elevator shaft exterior completed (elevator itself is not to be installed...  this is allowance for future plans.)
Main floor, heating elements being installed.   Insulation added.
More electric, floor heating, etc.   Cement floor pouring day!  Starting at existing library wall.
Cement floor pouring day! Center of building.   Cement floor pouring day!

Next to the bay windows.

Cement floor pouring day!

Finalizing.

  Cement Floor Done!  Photo taken 03/16/2007.
New 'main' entry being constructed.   Sky Lights, windows are 'in', and the drywall is up.
Drywall installed.   Playground 'side'.
Inside the original library, looking at the new entryway (under construction).  04/06/2007   Priming and Painting.

04/06/2007

Priming and Painting

04/06/2007

  Outside of the small conference room.  04/06/2007
Inside of the small conference room. 04/06/2007   View from the basement, looking up the stairs to the new library.  04/06/2007
View of the original entryway into the library, slowly being torn apart for the new.  04/06/2007   Siding up on playground side of building.  Note the trees have been removed.  04/06/2007
Parking lot view of new building.  Siding has been started.  04/06/2007   New Windows next to flower garden.  04/08/2007
New Windows next to flower garden.  04/08/2007   New Windows next to flower garden.  04/08/2007
Starting the process of moving ALL those books!  04/08/2007   Starting the process of moving ALL those books!  04/08/2007
Starting the process of moving ALL those books!  04/08/2007   Taking a break...  photo of several of our library board members.  04/08/2007
Installing lights.  04/08/2007   06/22/2007
06/22/2007   06/22/2007
06/22/2007   06/22/2007
06/22/2007   06/22/2007
06/22/2007   06/22/2007
06/22/2007   06/22/2007
06/22/2007   Open House / Dedication

06/30/2007

Open House / Dedication

06/30/2007

  Open House / Dedication

06/30/2007

Open House / Dedication

06/30/2007

  Open House / Dedication

06/30/2007

         
         
         

 

 

---  END OF PHOTOS  -----